Construction Payment Schedule

Construction Payment Schedule

Booking Amount 15% Design prep, soil test , site survey & topo drawings, material & contractor blocking.
Site Marking Sets 25% Casting of footings , Raising of columns to plinth level, consolidation of soil,casting of plinth beam and completing (M20 or M25) for below flooring within the plinth area, sump top.
Brick work 10% Construction of brick wall, casting of lintels, chajja.
Slab 10% Casting of roof slab with shuttering, tying of steel for roof, electrical conduit laying.
Plastering work 8% External / Internal plastering.
Flooring 8% Fixing of tiles for bath rooms, Laying of granite or vitrified tiles for flooring in other areas.
Electrical & Plumbing 7% Plumbing and Electrical works internal with laying of pipes.
Wood work and railing work 7% Carpentry works of all doors and windows, Fabrication of railings.
Interior & Painting Work 5% Interior woodwork as per the design.
Painting of internal and external wall with putty works for internal wall, exterior emulsion painting, all finishing.
Handover 5% Final handover.